Two challenges addressed with the integration of the turbinator

Two challenges addressed with the integration of the turbinator (Belgium)

In 2016, Tank Storage Verbeke in Hemiksem site was expanded with six new storage tanks. The tanks are in a bunded area and are connected to the truck loading station and jetty. The area is fitted with a fixed firefighting system. There are two challenges that the site had to deal with;

Testing the system

The new extinguishing foam systems had to be independently verified. For this a test was performed in the presence of an inspection agency. During the test we measured the actual water flow and checked the operation of the Turbinator’s: the mixing ratio of the extinguishing foam with the water. All results were good, making it a successful test.